Showing posts with label Controller. Show all posts
Showing posts with label Controller. Show all posts
Wednesday, May 27, 2009
Left elevator stiffeners
Drilled on the stiffeners on the upper surface. Had a visit from the controller yesterday. Everything was OK, and the books signed.
Wednesday, April 30, 2008
Visit by the controller
The controller visited today, before I rivet on the skins. After a few adjustments to some rivets that were not squized enough, everything was OK. I think I will order a pneaumatic squizer from Avery tomorrow, or at least before I start with the wing spar.
Subscribe to:
Posts (Atom)