Showing posts with label HS spars. Show all posts
Showing posts with label HS spars. Show all posts

Monday, February 22, 2010

Primed the spars

Deburred and primed the spars. I have to ventilate the house due to the fumes, but when the outside temp is -20 C it gets rather cold :-)

I also replaced the LCD screen on Olaugs Asus EEE after it had rough landing on the floor. Makes me wonder, that LCD screen is tiny. Hooked up to a NI Compact RIO or some other compact embedded system. Or an industrial touch screen and embedded NI logging system.

Front and aft spar HS ready for deburring

Both spars are ready for deburring and priming. I had one pair of hinge brackets without rivet holes, and installed those because the original ones were a bit off.