RV-4 build log
An online log of the making of a RV-4 experimental aircraft.
Showing posts with label
hs ribs
.
Show all posts
Showing posts with label
hs ribs
.
Show all posts
Saturday, March 13, 2010
HS ribs deburred and primed
Deburred an prmed the HS ribs.
Sunday, March 7, 2010
HS ribs ready for priming
Drilled the ribs into yheir positions. Ribs are ready for priming and deburring.
Monday, March 1, 2010
Fluted HS ribs
Measured rivet lines and rivet positions on the ribs. Fluted the ribs and made the extentions on the tip ribs so they fit with the skin.
Older Posts
Home
Subscribe to:
Posts (Atom)