RV-4 build log
An online log of the making of a RV-4 experimental aircraft.
Tuesday, December 7, 2010
Drilled right elevator skin
Measured and drilled the skin to the skeleton. The tip rib remains, but 8 will install the elevator to the HS first to get it as straight as possible.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment