Showing posts with label elevator skin. Show all posts
Showing posts with label elevator skin. Show all posts

Tuesday, December 7, 2010

Drilled right elevator skin

Measured and drilled the skin to the skeleton. The tip rib remains, but 8 will install the elevator to the HS first to get it as straight as possible.



Sunday, December 5, 2010

Right elevator skin ready to be drilled

Measured and roughly trimmed the skin. It is now ready to be drilled to the skeleton.

Monday, May 24, 2010

Riveted the stiffeners to the skin

Dimpling and riveting of stiffeners to the left elevator skin. I am a bit confused regarding the sequence of the trim and the cutting of the skin and riveting of the skeleton. Have to study the drawings closely as the manual doesn't make 100% sense.