RV-4 build log
An online log of the making of a RV-4 experimental aircraft.
Thursday, June 16, 2011
right elevator leading edge
Bent and drilled the leading edge. Have to do some fine adjustments to the curvature before riveting.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment