RV-4 build log
An online log of the making of a RV-4 experimental aircraft.
Saturday, April 17, 2010
Left elevator
Placed and drilled the brackets in place for the hinge rods on the left elevator. Fluted the tip ribs.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment