Riveted the elevator spars. Reveived a 28 inch sheet of 032 alclad since I already have used some of the first one making it too short for the elevators. Together with the sheet I also received 400 CS4-4 rivets for my neighbour to use on his litle trailer for his motorcycle.
The new raw water cooling pump for my boat also finally showed up after being stranded by volcanic ash I guess. It looks very cool and "boatish" being made of solid brass.
No comments:
Post a Comment