Wednesday, March 31, 2010

Riveting HS skin

Allmost finished. I used Cherry max on the 407.

Tuesday, March 30, 2010

Riveting HS skin

Dimpled the HS skins and started riveting them.



Monday, March 29, 2010

Deburring, deburring and dimpling

Deburred the skin and skeleton. Primed the skin and dimpled the skeleton.

Saturday, March 27, 2010

Finished drilling the HS skin

The HS skins are ready for deburring and priming.

Monday, March 22, 2010

More HS skin

Measured and started drilling the other side.

Sunday, March 21, 2010

HS skin drilled

One skin drilled on. The other one is ready for drilling.

Saturday, March 20, 2010

Right skin ready for drilling

Measured up all the rivet lines. Ready to start drilling on one skin.

Tuesday, March 16, 2010

Adjusted the skeleton in the jig

Measured up the skeleton in the jig and fastened it with clamps and long bolts. The tip flanges will be riveted into the tip ribs when the skins are on.





Sunday, March 14, 2010

HS skeleton riveted together

Riveted together the HS skeleton and placed it in the jig.

Saturday, March 13, 2010

Sunday, March 7, 2010

HS ribs ready for priming

Drilled the ribs into yheir positions. Ribs are ready for priming and deburring.

Tuesday, March 2, 2010

HS skeleton

Started mounting the skeleton.



Monday, March 1, 2010

Fluted HS ribs

Measured rivet lines and rivet positions on the ribs. Fluted the ribs and made the extentions on the tip ribs so they fit with the skin.