Sunday, December 12, 2010

More trimming

Started trimming (cutting and filing) on the right elevator skin. Cut out both tip skins from the sheet of metal.

Tuesday, December 7, 2010

Drilled right elevator skin

Measured and drilled the skin to the skeleton. The tip rib remains, but 8 will install the elevator to the HS first to get it as straight as possible.



Sunday, December 5, 2010

Right elevator skin ready to be drilled

Measured and roughly trimmed the skin. It is now ready to be drilled to the skeleton.