RV-4 build log
An online log of the making of a RV-4 experimental aircraft.
Showing posts with label
finished
.
Show all posts
Showing posts with label
finished
.
Show all posts
Friday, May 23, 2008
The HS is finished
The first piece of the RV-4 is finished.
Older Posts
Home
Subscribe to:
Posts (Atom)